E-mail Login

USER NAME :

PASSWORD :



Visitors
117715
Feasibility study Road divert in front of Siem Reap Airport

- The design for construction of the road located at the front of International Airport Siem Reap in accordance with the Transport Lane of the General airport-planning architectural concept for development of the contemporary Siem Reap Airport.

#56, Street 242, Sangkat Chaktomuk, Khan Daun Penh, Phnom Penh, Cambodia
Copyright © PPIC Co,.LTD